Factory

TEAK PROCESS

  • 1Step 1: Log Square
  • 2Step 2: Saw Mill
  • 3Step 3: Kiln Dry (1st Chamber)
  • 4Step 4: Kiln Dry (3rd Chamber)
  • 5Step 5: Sawn Timber Storage
  • 6Step 6: Milling Process
  • 7Step 7: Planner
  • 8Step 8: Radial Arm
  • 9Step 9: Tennoner
  • 10Step 10: Thicknesser
  • 11Step 11: Table Saw
  • 12Step 12: Scroll Bandsaw
  • 13Step 13: Sanding Master
  • 14Step 14: Assembling 1
  • 15Step 15: Assembling 2
  • 16Step 16: Prior to Sanding
  • 17Step 17: Sanding
  • 18Step 18: Carton Boxes
  • 19Step 19: Loading

CASTING ALLOY PROCESS

  • 1Step 1: Wood Selection
  • 2Step 2: Ingot (Raw Materia)
  • 3Step 3: Casting
  • 4Step 4: Sanding
  • 5Step 5: Cleaning
  • 6Step 6: Spraying
  • 7Step 7: Drying
  • 8Step 8: Assembling
  • 9Step 9: Packaging Process
  • 10Step 10: Packaging
  • 11Step 11: Ready Goods
  • 12Step 12: Workshop

WELDING AND WEAVING PROCESS

  • 1Step 1: Assembling Area
  • 2Step 2: Bandsaw
  • 3Step 3: Batyline Processing
  • 4Step 4: Drilling Milling
  • 5Step 5: Frame
  • 6Step 6: Packaging Area
  • 7Step 7: Pipe Roller
  • 8Step 8: Polishing Area
  • 9Step 9: Raw Material
  • 10Step 10: Weaving Area
  • 11Step 11: Welding Area
  • 12Step 12: Welding Tig